Fascination Über krimi

Hinein 1993 the power grid connections rein the Berlin-Brandenburg capital region were renewed. Hinein most of the inner districts of Berlin power lines are underground cables; only a 380 kV and a 110 kV line, which ansturm from Reuter substation to the urban Autobahn, use overhead lines. The Berlin 380-kV electric line is the backbone of the cit

read more